suggestions for nuclear waste storage – EIA process flow of: 1. Project Screening 2. Scoping 3. Proj

suggestions for nuclear waste storage –
EIA process flow of:
1. Project Screening
2. Scoping
3. Project Description and consider alternatives
4. Stakeholder involvement
a. prediction of impacts
b. evaluation of impacts
c. Mitigati

Document Preview:

EIA process flow of:
1. Project Screening
2. Scoping
3. Project Description and consider alternatives
4. Stakeholder involvement
a. prediction of impacts
b. evaluation of impacts
c. Mitigation methods
d. Monitoring and Audit measures
5. EIA Report
The project I suggested for our consideration is the installation of temporary accommodation (camps) in remote areas for a construction workforce of 4000 people. Each camp will house 800 personnel with the workforce flying in at the beginning of their rotation, working from the camp for 21 days and then flying back to Perth for 8 days.
So what I need from you to do 6 slides PowerPoint about 1-project Screening and 2- Scoping. (Write down to each slides the explanation of each point in the slides.)
That is what I need and there is attached file for the main project.
Thanks